DIY Grid-Tied Solar 220V

Solar panels attached to the power advantage that no batteries are needed because grid serves as a backup for the night and cloudy days transition. Many utilities will allow you to reduce your energy costs by feeding additional power back into grid, but all are some conditions that solar power system must be met before it is allowed to be connected to the network. Important prerequisites are generated power quality, system safety and dosage of energy.

Once these requirements are addressed, the grid connection of solar power systems can reduce power costs. Wiring solar and grid-connect inverter. Bring lead with quick connector to the positive terminal of the inverter and the plug in quick connector comes from the positive side of solar panels. Bring quick connector to the negative pole Inverter and plug in quick connector coming from the negative side of the solar panel.

DIY Grid-Tied Solar 220V

Connect all additional solar panels same way. They will all be connected in parallel and inverter will have several leads coming off each terminal and going to individual solar panels. Connect inverter and automatic disconnect switch.

Connect two 220V AC output terminals from inverter to two input terminals of disconnect switch. This switch is essential safety feature which disconnects solar power when there is power failure in grid. Test switch — it should not close when there is power on solar panel side but not on other side.

Look up rated output current on inverter nameplate and select AC cable running from automatic disconnect switch to electric panel. Connect to appropriately sized breaker. For most solar systems, current at 220V will be less than 15A, so 15A breaker connected to AWG No.

14 wire will be enough. For 20A, 30A and 40A, breakers of corresponding sizes should be connected to AWG No. 12, No.

10 and No. 8 wires. Check utility requirements for metering and install additional metering as required.

Many utilities will allow you to run existing power meter backward, which means meter will slow down as some of your power needs are covered by solar panels. If solar system is generating more power than is needed, extra power will flow into grid through existing connection and make existing power meter run in reverse. No additional metering or additional hook-up is required for this arrangement and utility is crediting you for power you generate at same amount as it charges you for power used.

Some utilities will pay for power generated at different rate than rate they charge for power used. In this case, separate power meter has to be installed to measure only power generated by solar panels and sent into grid. Install this power meter between automatic disconnect switch and breaker.

Wire two 220V AC terminals from disconnect switch to two input terminals of power meter. Wire power meter output terminals to circuit breaker.While this is extra expense, rate paid for solar power is often higher than amount you pay for grid power so there may be long-term advantage.

We hope this information about “DIY Grid-Tied Solar 220V” is really helpful to you as well as other information related to Solar_Energy